Mt Whymper Current Approach Conditions and Routes
GoogleEarth abstract of the approach on Copper Canyon Main and SE and E ridge routes to the summit of Mt Whymper.
Current conditions, June 2011. C27 is clear and 4WD accessible. C29 winter washout during 2009 at the 1.3 km mark has been repaired and the road is driveable to the just past the first switchback after the "keep right" waypoint at about 800 metres elevation.